NewzShewz
No Result
View All Result
Friday, February 27, 2026
  • Home
  • Finance
  • Politics
  • Energy
  • International
NewzShewz
  • Home
  • Finance
  • Politics
  • Energy
  • International
No Result
View All Result
NewzShewz
No Result
View All Result
Home Energy

Rs 4.04/unit relief part of base tariff not linked to FCA or QTA : Power Division

by AMG
February 27, 2026
in Energy
0
Renegotiation of IPP Deals: Politics at the Cost of Investment
1
VIEWS
Share on FacebookShare on Twitter

ISLAMABAD: The Power Division on Friday clarified that the Prime Minister’s relief package of Rs 4.04 per unit for industry forms part of the base tariff, while Fuel Cost Adjustments (FCA) and Quarterly Tariff Adjustments (QTAs) are variable components applied on a monthly and quarterly basis.
In a statement, the spokesperson for the Power Division said recent media reports had created unnecessary confusion by linking the positive FCA with the electricity relief package announced by Prime Minister Shehbaz Sharif. He emphasised that the two are separate elements within the tariff determination framework and have no direct relationship.
The spokesperson explained that FCA and QTAs are routine regulatory mechanisms applied strictly on the basis of actual variations in generation costs and system performance during a given period. These adjustments may be positive or negative depending on prevailing fuel prices and electricity generation patterns, and are implemented transparently under the approved tariff regime.
Accordingly, any increase or decrease on account of FCA reflects only month-to-month changes in actual fuel costs and does not constitute withdrawal or reduction of any policy relief, he said. Similarly, QTAs are periodically applied to reconcile verified cost variations and may offset or moderate the impact of FCA adjustments.
He categorically stated that the Prime Minister’s relief of Rs 4.04 per unit remains fully effective and unchanged as part of the base tariff. The application of FCA or QTA is independent of this relief and operates as a standard feature of the electricity tariff mechanism applicable to all consumers.
The spokesperson maintained that associating the recent FCA with erosion or reversal of the Prime Minister’s relief package amounts to a mischaracterisation of tariff mechanics. The announced relief continues to remain in place, while FCA and QTAs are being applied strictly in accordance with actual costs under the established regulatory framework.
In a separate clarification, the Power Division highlighted what it described as the exceptional performance of the national power system in January 2026.
Despite challenging network and hydrological conditions — including canal closures, fog-induced transmission line trippings in northern and southern regions, and a severe cold wave — the system achieved its highest-ever January peak generation of 16,584 MW and an average generation of 12,239 MW. Actual generation stood at 9,106 GWh against a reference projection of 7,962 GWh, exceeding projections by approximately 14 percent and marking a 13 percent increase over January 2025.
The month witnessed major generation constraints, including: (i) a forced outage of 1,040 MW at K-3; (ii) a forced outage of 1,180 MW at Haveli Bahadur Shah (HBS); (iii) partial and forced outages at the Sahiwal Coal Power Plant; and (iv) a 300 MW refuelling outage at C-III.
According to the Power Division, despite reduced baseload capacity and limited hydel availability, the national power system was operated in strict adherence to merit-order dispatch. Optimal use was made of available thermal resources, hydel generation was managed carefully within water constraints, and transmission corridors were continuously monitored. Proactive security measures ensured grid stability and prevented cascading failures or widespread load management.
The division appreciated the resilience and professionalism demonstrated by system operators under demanding conditions.
It added that commercial implications arising from the rebasing of reference tariffs in January 2026 may be obtained from CPPA-G.
Currently, system demand is being met efficiently through hydel generation supported by improved water inflows, with only one RLNG-based plant in operation. No furnace oil-based generation has been utilised, including during peak demand hours at Iftar, Taraweeh, and Sehr. Ends

Related Posts

SSGC Board appoints Rajput as MD/CEO for three years
Energy

SSGC Board appoints Rajput as MD/CEO for three years

by AMG
February 27, 2026
0

ISLAMABAD: SSGC's Board of Directors has appointed Mr. Muhammad Amin Rajput as the Company's Managing Director / Chief Executive Officer...

Read more
GHCL Board’s First Meeting Set to Be stormy
Energy

PD rejects NEPRA’s claims about Discos performance

by AMG
February 26, 2026
0

ISLAMABAD: The Power Division has rejected claims made by the National Electric Power Regulatory Authority (NEPRA) in its Performance Evaluation...

Read more
  • Trending
  • Comments
  • Latest
Dasu Transmission Line Controversy Continues

OSD DMD refutes incompetence label , highlights NTDC leadership flaws, WB project issues, corruption, and contractor influence”

June 12, 2025
Investigations into IPPs Undermine Investor Confidence

KE Board…. thank you. We are leaving the meeting

November 13, 2025
Newzshewz Exclusive

NTDC BoD removes ” incompetent ” officials

April 23, 2025
Zargham Eshaq Khan steps down as MD NESPAK

Zargham Eshaq Khan steps down as MD NESPAK

November 1, 2025
Enhanced Rationalization in the Categorization of SOEs

Enhanced Rationalization in the Categorization of SOEs

0
PPIB to extend TLoS of ZSPL

PPIB to extend TLoS of ZSPL

0
CCP Fines Diamond Paint Industries PKR 5 million

CCP Fines Diamond Paint Industries PKR 5 million

0
Steering Committee on Discos

Steering Committee on Discos

0
Renegotiation of IPP Deals: Politics at the Cost of Investment

Rs 4.04/unit relief part of base tariff not linked to FCA or QTA : Power Division

February 27, 2026
SSGC Board appoints Rajput as MD/CEO for three years

SSGC Board appoints Rajput as MD/CEO for three years

February 27, 2026
GHCL Board’s First Meeting Set to Be stormy

PD rejects NEPRA’s claims about Discos performance

February 26, 2026
Power Minister seeks justification of Moro-Matiari Transmission Line

Low utilization of renewable energy plants , high capacity payments push up Pakistan’s power costs

February 26, 2026
  • Home
  • About
  • Contact Us
  • Privacy Policy
  • Cookie Policy
  • Terms and Conditions
Contact us: contact@newzshewz.com

No Result
View All Result
  • Home
  • Finance
  • Energy
  • International
  • Politics
This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.