NewzShewz
No Result
View All Result
Tuesday, October 20, 2026
  • Home
  • Finance
  • Politics
  • Energy
  • International
NewzShewz
  • Home
  • Finance
  • Politics
  • Energy
  • International
No Result
View All Result
NewzShewz
No Result
View All Result
Home Energy

Rehabilitation of Guddu 747 to reduce cost by Rs 4.19/kWh: PD

by NewzShewz Desk
August 30, 2026
in Energy
0
 Guddu’s O&M to be outsourced
51
VIEWS
Share on FacebookShare on Twitter

ISLAMABAD : Power Division has claimed that with its tireless efforts bids are invited to rehabilitate steam turbine of Guddu 747 Power Plant that may result in reduction of generation cost by Rs. 4.19 per unit—from Rs 13.87 to Rs 9.68 per unit while unlocking an additional 297 MW of capacity.

According to Power Division, currently, as the Steam Turbine-16 and its associated generator remain out of service following the July 2022 fire, the plant operates in open-cycle mode at roughly 450 MW, ranking it at 11th in the dispatch queue with expensive power. Once restored to full combined-cycle operation, the plant will generate its designed 747 MW while improving its merit-order standing to approximately 7th, giving the system operator a larger block of lower-cost energy to displace pricier alternatives.
Following a detailed technical study and engineering review, the procurement process for rehabilitation of the damaged steam turbine has now been formally initiated. Targetted commissioning date of the repair works in December 2028.
The Power Division conducted comprehensive integrity assessments, culminating in a focused EPC-turnkey procurement package. Following detailed evaluation international competitive bids have been invited for the rehabilitation of ST-16 and allied equipment, with submissions due by 7 October 2026. This marks a decisive step forward in restoring the plant to its full potential.

The additional 297 MW of generation capability alone represents a 66 percent increase over current output, ensuring that Pakistan gets the maximum possible value from its existing generation assets.

Beyond the direct financial savings, the project holds strategic value for Pakistan’s national grid. Guddu sits at a critical junction of the transmission network and the north-south power flow corridor, so bringing the plant back to full capacity will enhance operational resilience and flexibility. The Power Division’s proactive approach underscores the government’s commitment to maximising existing assets, improving efficiency, and delivering tangible value to consumers without depending solely on new generation infrastructure. Ends

Related Posts

Finance Minister Chairs Meeting on Gas Sector Reforms, Reviews Restructuring and Deregulation Roadmap
Energy

Finance Minister Chairs Meeting on Gas Sector Reforms, Reviews Restructuring and Deregulation Roadmap

by NewzShewz Desk
October 19, 2026
0

Federal Minister for Finance and Revenue, Senator Muhammad Aurangzeb, chaired a high-level meeting to review the proposed restructuring and deregulation...

Read more
Renegotiation of IPP Deals: Politics at the Cost of Investment
Energy

Expensive RLNG, imported coal, previous adjustments drive up September power costs

by NewzShewz Desk
October 17, 2026
0

ISLAMABAD : A massive increase in the prices of regasified Liquefied Natural gas (RLNG) and Residual Fuel Oil (RFO), coupled...

Read more
  • Trending
  • Comments
  • Latest
Dasu Transmission Line Controversy Continues

OSD DMD refutes incompetence label , highlights NTDC leadership flaws, WB project issues, corruption, and contractor influence”

June 12, 2025
Investigations into IPPs Undermine Investor Confidence

KE Board…. thank you. We are leaving the meeting

November 13, 2025
Newzshewz Exclusive

NTDC BoD removes ” incompetent ” officials

April 23, 2025
Zargham Eshaq Khan steps down as MD NESPAK

Zargham Eshaq Khan steps down as MD NESPAK

November 1, 2025
Enhanced Rationalization in the Categorization of SOEs

Enhanced Rationalization in the Categorization of SOEs

0
PPIB to extend TLoS of ZSPL

PPIB to extend TLoS of ZSPL

0
CCP Fines Diamond Paint Industries PKR 5 million

CCP Fines Diamond Paint Industries PKR 5 million

0
Steering Committee on Discos

Steering Committee on Discos

0
Finance Minister Chairs Meeting on Gas Sector Reforms, Reviews Restructuring and Deregulation Roadmap

Finance Minister Chairs Meeting on Gas Sector Reforms, Reviews Restructuring and Deregulation Roadmap

October 19, 2026
Renegotiation of IPP Deals: Politics at the Cost of Investment

Expensive RLNG, imported coal, previous adjustments drive up September power costs

October 17, 2026
NEPRA okays new financing mechanism for 59 IPPs of different technologies

CPPA-G seeks positive FCA adjustment of Rs 2.56/kWh for September 26

October 15, 2026
PM appints Lt. General (retired) as SAPM on Energy

PM appints Lt. General (retired) as SAPM on Energy

October 14, 2026
  • Home
  • About
  • Contact Us
  • Privacy Policy
  • Cookie Policy
  • Terms and Conditions
Contact us: contact@newzshewz.com

No Result
View All Result
  • Home
  • Finance
  • Energy
  • International
  • Politics
This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.